Transport for London drop part of Thamesmead DLR plan impacting future service levels

TfL have dropped a proposal to build a turnback along the Beckton DLR branch limiting future service levels to any new extension to Thamesmead.

Earlier rounds of consultation mentioned a turnback at Custom House, Royal Victoria or Canning Town enabling shuttles between Thamesmead and either site to operate in addition to trains heading to central London. This is now not part of the initial construction plan.

Turnback at Custom House enabling higher frequency now dropped

As such trains per hour to Thamesmead would be every 8-10 minutes. Not a poor level by any means but someway behind levels from Abbey Wood station which sees 12 Elizabeth line trains per hour (one every five minutes) and a potential 8-10 trains per hour via Southeastern and Thameslink (around every 7-8 minutes) post-service improvements this December.

Abbey Wood formerly had around 10 tph in the peaks until recent cuts. The Elizabeth line is also expected to improve yet further into the 2030s with the addition of new trains now being built.

So if you live in central, east or south Thamesmead what to do? You can take a bus to the proposed DLR for 6-8 trains per hour or a bus that takes the same time for much of the town towards Abbey Wood station for 22+ trains per hour. Not a tough decision.

Better option?

It again raises the question of why many in Thamesmead would use the new DLR unless living in the near vicinity, given Abbey Wood station is quick to access, offers many more trains which are faster than the DLR and serves many more destinations.

Given how vast and sprawling Thamesmead is, many existing residents will not be in the vicinity of the new DLR station which only serves the north of town, and so a bus will still be required to reach it.

Thamesmead Central. Three minutes on a bus to Abbey Wood station or three minutes bus to DLR? Liz line every time.

Put it this way, as someone who has lived nearby, worked and visited Thamesmead regularly for many, many years, unless I’m within a short walk to the DLR station I would always go to Abbey Wood or Woolwich instead.

It’ll be faster for almost every journey be it the City or West End, Stratford, London Bridge, west of London, north London, you name it. Unless you want Beckton where next to nothing exists.

Given a bus is required to reach the Thamesmead DLR station, better to take a bus to Abbey Wood or Woolwich where transport options are far better. Buses from across Thamesmead take 3-5 minutes to reach Abbey Wood station as it is. They run every single minute as it is.

Buses from Central Thamesmead to Abbey Wood high frequency even at night

Even some of the vast area designated for any Thamesmead New Town would be no closer to the potential DLR that existing stations in Woolwich.

Woolwich of course has far better options.

Budget

Of course thousands of new homes still require a serious transport options. Buses alone won’t cut it.

With a budget of at least £1.5bn+ and potentially up to £2 billion (granted, this includes Beckton Riverside station but much of that cost is a tunnel to Thamesmead) the area could instead enjoy a high capacity, high speed transport link such as trams serving all of Thamesmead – including thousands of new homes – and by linking to Abbey Wood and Woolwich would offer extraordinary benefits compared to the existing DLR plan.

Tram in Edinburgh. No need for grade separation unlike DLR. Platforms at street level

During previous consultations TfL ruled out a tram but this was after only looking at a short route from Thamesmead to Abbey Wood. That inherently made it unfeasible by restricting its scope. It did not consider trams in a wider network connecting to nearby areas in line for thousands of new homes in surrounding towns.

Of course a short tram line makes little sense in isolation. It was as if TfL made their minds up beforehand by crippling the tram option through only considering such a short route.

Yet a tram network with no need for grade separation unlike the DLR and in an extensive network of wide dual carriageways as currently exists could benefit tens of thousands of new homes across Thamesmead, Belvedere, Erith and beyond.

Ideal streets for trams across former Greenwich Waterfront Transit route.

A tram could be extended more easily to serve other areas in line for major housing growth aside from Belvedere, Erith and all of Thamesmead by linking to Plumstead, Woolwich, Charlton and Greenwich peninsula – in large part duplicating the former Greenwich Waterfront Transit cancelled by Boris Johnson.

A stop on a tram network is vastly cheaper to build compared to an elevated station or one below ground on the DLR.

But instead of that, TfL are ploughing ahead with a DLR extension serving one small part of north Thamesmead, doesn’t benefit most existing parts of town, doesn’t link to nearby Elizabeth line and National Rail routes nor offer much future extension potential.

Trams could head from Thamesmead to Belvedere and Erith

While TfL do keep mentioning a possible extension to Belvedere, the need for grade separation in the form of viaducts or tunnels renders that expensive and limited in scope. It won’t go on to Erith, for example, which also has substantial housing plans. A tram can integrate far better into existing streetscapes.

TfL also state they may build a turnback in future but its absence now rings alarms in conjunction with the host of other downsides the DLR offers for its high cost and limited ability to serve growth areas across a wider area.

Oh, and by going Thamesmead it also means little chance of serving Barking Riverside as once planned despite it’s recently doubled 20,000 home plan.

Original DLR extension plan via Barking.

It’s something else TfL state *may* happen one day. But not anytime soon. Don’t bank on it.

Barking Riverside in the meantime will have the solitary Barking Riverside station offering low frequency services for 20,000+ homes. Doubling the masterplan in Barking to 20,000 dwellings was approved in March 2026.

Barking Riverside’s vast site of 20,000 homes was to see three DLR stations. Now none if Thamesmead plan goes ahead

For any DLR route to Dagenham Dock (which also has thousands of new homes and a poor c2c rail service level) via Barking Riverside the Beckton branch would see three branches, and a turnback would be essential.

Not including a turnback initially as now pro posed makes the Barking route harder to justify in future.

Ultimately a string of bad decisions, of which much came under Boris Johnson, have lead us to this point. But TfL under the current Mayor isn’t reversing those mistakes but pushing the flawed DLR leaving many potential growth areas with very little in terms of transport.

A turnback not being included in the proposed extension when built is the latest chipping away at this scheme, which derives from far better transport options. Limiting the extension’s already meagre capability is another sign this project is a bodge job that offers much less for new housing and vast areas of east and south east London than TfL once proposed.

 

Join the mailing list here to receive updates in your mailbox.

Support this website via Paypal here

There's also the Ko-fi option to buy me a coffee

Many thanks

You can also support the site by adding the Murky Depths as a trusted source in Google here

There's also a Facebook page for the site here

10 thoughts on “Transport for London drop part of Thamesmead DLR plan impacting future service levels”

  • Thankyou for this very detailed comment on the DLR Thamesmead link – long promised as you say and heralded by local politicians in the run up to the May council elections.
    A suitable topic for newly elected Greenwich’s Scrutiny Transport Panel to examine and ask questions of TfL ?
    The DLR is a great success in other parts of East and South East London and Thamesmead deserves to get the full benefit.
    Trust local Thamesmead Cllrs will also be asking questions.

    Reply
  • Speaking of Thamesmead buses, there’s still total radio silence on the supposed BRT coming by 2029. Except I was going back over some of the planning docs for the bus lanes proposal and it lept out at me that they have proposed a phased implementation of those starting in 2027 and completing in… You guessed it, 2029! So yeah, the much heralded BRT is just the bus lanes and probably also that new bus road that makes no real sense other than pretending to give West Thamesmead faster access to the new DLR when we’d all rather go to Woolwich for the Lizzy Line.

    Reply
    • Thamesmead is on need of bus setvices improvements to serve new developments across Thamesmead.
      Route 472 should never had been axed. Now we need new local bus routes to link the Thamesmead area with other areas of South East London
      .

      Reply
  • Thamesmead is on need of bus setvices improvements to serve new developments across Thamesmead.
    Route 472 should never had been axed. Now we need new local bus routes to link the Thamesmead area with other areas of South East London
    .

    Reply
  • There’s no point in having a turnback as barely anyone will be using DLR at all…what’s the point, unless someone wants to go to Backton or Gallions Reach 🙂 … In any case a better option would be to connect Beckton with Barking Riverside and then south to Abbey Wood via Thamesmead (via a tunnel) . This would allow to interchange at Barking Riverside (from Overground Suffragette Line) connecting vast parts of North and East London with South East (Kent)….But TfL is very good when it comes to wasting tax payers money, sadly…I wouldnt expect much traffic and profit from this extension…

    Reply
    • 100% the best option would be the overground extension enabling a east-southeast overground connection that could take barking trains to Woolwich, Lewisham, Peckham and beyond. Same quantity of tunnels, lots more opportunities for stations in Thamesmead (i.e. Thamesmead north, Thamesmead south) and it would use the dead land that the military has never cleared out.

      I think there could be loads of money (beyond the land value rise from a DLR option) made from the connectivity benefits north and south of the river though especially in Thamesmead.

      Given TFL use the same incompetent consultants for their schemes (I.e. what nutters decided the Liz line abbey wood branch should end before midnight on a Saturday night and 10pm on a Sunday, what nutters set out the methodology that enabled the DLR to win, what nutters did the passenger numbers for the woolwich Liz line that should always have had a 2nd entrance exit, which nutters decided the silver town tunnel was the optimal location, which nutters designed the O2 tube which simply can’t handle event nights and ordinary members of the public at the same time). So many examples and tfl are blowing the only billions that SE London will get in the next 30 years on this waste.

      Reply
    • Agreed. Extending the Overground would provide access to Rainham and Dagenham’s vast industrial estates, there are dozens of jobs I’ve turned down and have been unable to apply for because the only way to get to them is via the Dartford Crossing, completely unreliable and useless as a transport option. Throw in a new bus route or extension from Barking Riverside, and finally, from the South of the river you can access vastly more economic opportunity.

      Reply
      • I’ve just had another thought, if the overground extension were delivered and the Dagenham Dock DLR also, you would then have much better links east, not only to the industrial estates of Dagenham and Rainham, but also Tilbury, via the line to Southend, and all of the employment in the area of Essex, currently cut off by poor connectivity across the river. I’ve just quit my job in Tilbury due to the Dartford Crossing, but would’ve been able to keep working there had these rail links been in place.

        Reply
  • Trams might be ideal for Thamesmead but I still think that the DLR is planned to get extended to Thamesmead and maybe operate a new express bus service similar to the Superloop to run from Thamesmead to Abbey Wood, Woolwich and Dartford.

    Reply
  • I think that Thamesmead does the Docklands Light Railway whether if it does happen and construction of a new tunnel to be built to pass underneath River Thames.

    Reply

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.