Thameslink could cut numerous services on the Greenwich line this summer
A raft of service cuts could hit Thameslink services this summer including the Luton to Rainham service via Greenwich.
Hundreds of services look set to be axed between mid July and late August resulting in just one Thameslink train per hour on the line.
Cuts will hit connections to the Elizabeth line at Abbey Wood with services to-and-from Kent particularly impacted.

When we’ve seen services previously reduced to just one train linking the Elizabeth line and north Kent severe overcrowding has sometimes resulted.
Other stations would see far bigger gaps between services.
The full list of removed services sent to me is:
06:21 West Hampstead to Rainham
07:17 Luton to Rainham
08:17 Luton to Rainham
09:17 Luton to Rainham
10:17 Luton to Rainham
11:17 Luton to Rainham
12:17 Luton to Rainham
13:17 Luton to Rainham
14:17 Luton to Rainham
15:17 Luton to Rainham only runs West Hampstead and Rainham
16:17 Luton to Rainham only runs West Hampstead and Rainham
17:17 Luton to Rainham only runs West Hampstead and Rainham
18:17 Luton to Rainham only runs West Hampstead and Rainham
19:17 Luton to Rainham

05:30 Rainham to Luton – only runs between Rainham and West Hampstead
06:30 Rainham to Luton – only runs between Rainham and West Hampstead
08:30 Rainham to Luton
09:30 Rainham to Luton
10:30 Rainham to Luton
11:30 Rainham to Luton
12:30 Rainham to Luton
13:30 Rainham to Luton
14:30 Rainham to Luton
15:30 Rainham to Luton
16:30 Rainham to Luton
22:00 Rainham to West Hampstead
One train per hour for north Kent
Whilst this means just one train per hour from Abbey Wood to Kent stations which have been seeing strong growth in recent years. In the most recent passenger journey figures those north Kent stations saw strong annual growth with thousands of homes built along that stretch of line.
It also hits services in places such as Greenwich where gaps between services in peak tourist season will be 30 minutes.
A pretty abysmal service level for anywhere in inner London let alone a town and station popular with tourists. Deptford too will see no turn-up-and-go service level despite hundreds of new homes now being occupied near the station.

A look on Realtimetrains shows half of services in a given hour altered to “runs as required”. In effect they’re taken out of the standard timetable.
This isn’t a standard move and the question of why arises. Either staffing issues again with a lack of drivers or government are enforcing cuts. Something they’ve just undertaken on Avanti over the summer.
It’s likely it’ll be blamed on fewer passenger in summer, but reducing services to just one per hour and leaving large gaps even accounting for Southeastern services is far from sufficient even considering any reduction in passengers.

Thameslink will enter direct government control on 31 May 2026 before any cuts come into play, though in effect government have been running the railways anyway for years. Fares, services, staffing and much else all have to be agreed by the Department for Transport whether under direct control or via a third party.
So for all the PR, talk of Great British Rail improvements and new liveries on trains, is this government set to embark on more service cuts?
Cuts would impact trains passing through Housing Minister Matt Pennycook’s constituency of Greenwich and Woolwich, including hundreds of new homes now completing in Greenwich near Westcombe Park station. The government have previously stated that improved transport is required for new housing.
Thameslink history
Thameslink was only added to the Greenwich and Woolwich line as a late addition to the overall programme and saw problems from day one back in May 2018. It took six months to commence a two train per hour service on certain days as should have occurred from the start.
It was only a full year after the first train started that the original service level was achieved.
Cuts then occurred in 2022 when it was once again back to one train per hour.
Reliability has also been poor since 2018 with the line seeing services dropped when any issue arises in the central London core or north of London.

If hundreds more services are to be cut this summer it again raises questions of whether Thameslink is even desirable to operate on the line. For all the upsides – and I use it regularly to reach the core and beyond – the continual treatment of the Greenwich line as second best is striking, and it’s particularly hitting many who seek to connect to the Elizabeth line from further afield.
Fewer passenger or not in summer is one train per hour from fast growing areas of north Kent to the Elizabeth line good enough? Or gaps of 30 minutes at busy inner London stations? And if the DfT are behind cuts, is this again showing a lack of interest in pushing economic growth and rail’s key role in doing so?

Making it harder to reach central London or tourist spots such as Greenwich across the summer tourist season does little to encourage people to spend money in bars, cafes, pubs etc when there. All while the service industry is struggling.
UPDATE: A Govia Thameslink Railway spokesperson said:

Sometimes I wonder if Labour are intent on throwing away power. Cutting services on a line from say, 8 to 6 trains an hour may be ok but down to one an hour from places like Gravesend and Greenhithe to Abbey Wood? In what world is that good enough. All it encourages is people to drive and more congestion in places like Dartford and in a world where other countries are encouraging public transport use due to the oil issue.
As for Pennycook they’re doing him no favours. Labour lost lots of seats to the Greens in Greenwich and this plays straight into their hands. Seriously NO ONE voted Labour to get rail cuts and weeks after nationalisation. It should be one of their success stories if they get it right. Instead cut backs!?! They have a deathwish.
Maybe the King of the North will save Labour from such silly own goals. How much will these cuts even save if it hits the wider economy and people travel less? Then again Burnham seems to adhere to nonsensical tropes like everywhere in the south is rich (take him to deprived parts of north Kent it may open his eyes) and transport in the south is fantastic (make him wait for the one train each hour in those large towns). I tend to defend Labour from a lot of attacks as much is inherited from rotten prior governments but they keep doing stupid things like these cuts which cost as much as they’ll ever save, will increase traffic congestion, hit poorer areas they’re supposed to serve like north Kent which is hardly a home counties stereotypical area of £2m houses and the like (the rich parts of Surrey it ain’t), and at a most basic level are a gift to political rivals.
Heidi Alexander was useless as the Labour MP for Lewisham and has Deputy for Transport under Sadiq Khan on the Greater London Authority at City Hall. No wonder she still cannort get anything right as Minister for Transport in the Labour Government..
I think Labour are hell bent on losing Power which to be brutally honest will be no bad thing. We have seen a slight swing to the Greens in Gteenwich in the local elections. The Gteens have also took neighbouring Lewisham from Labour.
But more importantly these cuts to the Thameslink services are a major blow for commuters and for those passengers who interchange on to the Elizabeth Line at Abbey Wood and reduce services on the Woolwich and Greenwich Line. Which has thousands of new homes built along the line. Including thousands of student rooms.
.
The line justifying cuts makes little sense. Passenger numbers fall 20 per cent apparently they say (though where would be interesting as some stations seeing reductions grew more than that last year alone) and that’s before factoring in new housing and demand for the Lizzie which is still growing.
But anyway if we ignore new homes, rising demand for the Lizzie and general rail recovery and assume numbers go down 20 per cent these cuts are 50 per cent in some areas. Even every 30 minutes is poor for urban, built-up areas. One an hour is simply rubbish.
It wouldn’t be so bad – at least between Dartford and central London – if previous Southeastern cuts after covid had been restored ASAP by the government upon election. However this government are taking two and a half years and five timetable changes before finally doing so (it’s finally happening in Dec 2026) leaving poor service levels.
I’ve always thought Thameslink a classic example of capital spend versus operational spend and the huge mismatch.
Billions were spent on wonderful stations and then everyday spend has been lacking ever since the big reopening in 2018 be it a lack of drivers for years and resultant cancellations, poor services as even two per hour is insufficient in many areas so people don’t use it let alone when some are cancelled, a lack of staff throughout the network aside from the core stations be it on trains or at stations and general poor quality of trains. Graffiti inside and out, general exterior dirt and toilets in terrible condition. None it it makes me want to use it nor presents a high quality “product” after so much was spent building infrastructure. Compare it to the Elizabeth line which is a runaway success.
Government control could rectify those issues but the penny pinchers are going for more cuts. They’ll probably get rid of the few staff next so ticketless travel goes up even more and cleaners sacked so the trains look ever worse.
There does seem to have been a lot of Network Rail building stuff and operators being allowed, or being told not to use it. It’s insane. I do think there’s an element of ideological pro car and anti rail going on – always has been with Labour – but it also just feels that they don’t understand how public services work. Poorer services become services for the poor. If you make something less attractive, fewer people use it. Meanwhile TFL goes from strength to strength WITH THE SAME POPULATION BEING SERVED!
I was going to write that I’m incredulous that they’d cut service linking to the Elizabeth line but then I thought, really, it’s not a surprise even if it is horrendous PR for Great British Railways and this government.
It’s the same government and Transport Secretary that pushed cuts on Avanti, that is overseeing the east-west rail shambles and that ripped out long drawn up plans for numerous rail upgrades last year while pushing road building. Another gift for the greens. A more inept government is hard to find. Down there with the Truss, Johnson, Grayling and Jeremy Hunts of this world.
Bring back the old Charing Cross to Gillingham semi fast service! The thameslink has always been worthless
I second this!
I third that. Reinstate the Charing Cross trains on the Wookwich and Gteenwich line. Including the semi fast trains between Gillingham and Charing Cross.
We always get a raw deal when other comes to public transport
Forth that too. This weekend has seen Charing Cross trains on this line but this needs to be returned as a regular full-time arrangement especially at weekends when Cannon St isn’t a viable option & changing at L/Bridge adds at least 10mins
Charing Cross trains need to return to the line ASAP
Same as happened at Avanti with the same press release.
They may lose some commuting in summer, but why do they want to a) make it difficult for the 80% at work and the untapped (including the 20%) who could be using the train for leisure.
Yet again we have an issue with the railway being seen as a business not a public transport network. And a commuter business rather than a public transport network of which commuting is ONE use.
Many of the approx nineteen million visitors to World Heritage Site Greenwich will come by train as well as the DLR and boat to Cutty Sark Gardens . There is also the Greenwich Foot Tunnel which has approx five thousand users on a daily basis.
However none of these travel routes is reliable . DLR is subject to weekend closures while the foot tunnel’s lifts are notoriously unreliable and would be better run by TfL, rather than the current inefficient management of Greenwich and Tower Hamlets Councils.
Reducing rail services to one of London’s World Heritage Sites does not make sense particularly during the summer months when visitor numbers are at a high.
I do sometimes wonder whether our transport operators are aware Greenwich is home to a World Heritage Site.
Heidi Alexander was useless as the Labour MP for Lewisham and has Deputy for Transport under Sadiq Khan on the Greater London Authority at City Hall. No wonder she still cannort get anything right as Minister for Transport in the Labour Government..
I think Labour are hell bent on losing Power which to be brutally honest will be no bad thing. We have seen a slight swing to the Greens in Gteenwich in the local elections. The Gteens have also took neighbouring Lewisham from Labour.
But more importantly these cuts to the Thameslink services are a major blow for commuters and for those passengers who interchange on to the Elizabeth Line at Abbey Wood and reduce services on the Woolwich and Greenwich Line. Which has thousands of new homes built along the line. Including thousands of student rooms.
.
I’m a big supporter of nationalisation and integrating track and train but always wary how government and the treasury would act when it happens. Yet even I’m surprised how bad Labour appears to be implementing it. Cuts mere days after taking over? Couldn’t get better PR for those who favour privatisation. Playing into the hands of Reform. Hapless leadership and ministers. Do this and all the announcements and talk about GBR will be hollow. Actions speak louder than words. With rail the fixed costs are high anyway so running these trains is the cheap bit. Cutting saves very little. It’s DOO so no onboard staff to pay just the driver and some electricity use. Is track access costs even a thing now it’s nationalised? Even if so the money moves from one governmental body to another so no loss overall.
I third that. Reinstate the Charing Cross trains on the Wookwich and Gteenwich line. Including the semi fast trains between Gillingham and Charing Cross.
We always get a raw deal when other comes to public transport
I have fond memories of the semi-fast and how quick it was from Abbey Wood to London Bridge and Charing Cross. I’m sure in the late 90s I reached Charing Cross form Abbey Wood in 25 minutes and London Bridge not far above 20 mins.
The issue with replacing the all-stopping Thameslink in north kent with a semi-fast is that would mean no direct trains from fast growing stations like Stone Crossing, Northfleet, Swanscombe to Abbey Wood. All have many new homes near the respective stations and require a better service. Eg after this news I had a look at how the developments are shaping up and work is continuining on 500+ new homes in Northfleet not far from that station. People would likely want to reach the liz line from there as its not a bad journey at all. 10-20 mins to AW then 10 mins to Canary Wharf, for example. Faster than HS1 and cheaper tickets.
Perhaps any service could stop at all those and then ran faster after Dartford along the old pattern of Dartford > Abbey Wood > Woolwich Arsenal > Charlton > Greenwich > London bridge. But that raises many other questions. Do SE have the stock? With ample growth at former quieter stations like Deptford and Plumstead should they be skipped?
Easy solution for the stations between Dartford, Greenhithe and Gravesend.
1: Extend a Greenwich line service to Gravesend calling at all stops
2: Have the Victoria to Gravesend service call at Stone, Swanscombe and Northfleet
In addition to the existing Sidcup service this would give those stations 6tph
3: Medway trains can then by pass those stations as they need a fast link to Abbey Wood for the EL and other connections on the line
4: If the semi fast returned it should be routed via Blackheath, wider choice of terminals to run this service through, either Charing Cross as before or Victoria (Lewisham to Victoria was supposed to go 4tph a while ago and still on the cards) if CHX has no space but this shouldn’t be a Cannon Street service as there’s enough of those, plus if you run it via Greenwich it’s no way you’d be able to skip Westcombe, Maze and Deptford as before in the noughties as it’s had the same amount of home building as between Dartford and Gravesend have had.
I may be wrong but I don’t recall the old semi-fast calling at Greenwich. Under the segregation imposed by the Thameslink Programme, only emergency/ ‘out of hours connections were provided to get back onto the CHX lines. The conflicting moves would be too disruptive in normal circumstances
The semi-fast used to go via Greenwich during weekday peak time only. Essentially Greenwich used to have 9 trains an hour at peak each way until the Thameslink works started around 2015:
– 3 per hour (every 20 mins) to Cannon Street (a rounder that stopped at all stations en route). I remember it being 7:17, 7:37, 7:57, 8:17, 8:37, 8:57 at Greenwich.
– 3 per hour (every 20 mins) to Charing Cross (again a rounder that stopped at all stations). These were at 7:27, 7:47, 8:07, 8:27, 8:47 at Greenwich (may have started earlier/later than these times).
– 3 per hour semi fast starting somewhere in Kent (Gillingham/Strood I think depending on time). Stopping pattern was Gravesend, Greenhithe, Dartford, Abbey Wood, Woolwich Arsenal, Charlton, Greenwich, London Bridge & Cannon St. These were always just a few mins after Charing X trains so 7:31, 7:51, 8:11, 8:31, 8:51.
Similar pattern the other way in the evening rush hour.
Off peak, it was six trains per hour (every 10 mins) all going to Cannon St (two rounders from Sidcup, two rounders from Bexleyheath and two starting at Dartford). Semi fast Gillingham went via Blackheath/Lewisham.
Sunday was 4 per hour, two to London Bridge only (from Plumstead only) and two to Charing Cross (from Dartford I think).
Much better than now as everywhere had at least 6 trains per an hour off peak (except Sunday) and extras in rush hour. Shame it had to change really (other than extending Sunday service to Cannon St and going beyond Plumstead).
But some of the comments here would result in some stations having fewer than 6 trains per hour which I consider unacceptable peak or off peak given the growth everywhere (Westcombe Park, Maze Hill and Deptford should not have a cut back service given there are no alternatives from those stations).
Only this government could have a flagship popular policy like bringing services back into public ownership and then straight away undermine it with cuts.
Is Heidi Alexander merely Chris Grayling in a mask? We must be told!
So so weird to grab defeat from the jaws of a GBR victory. It looks terrible given she was once MP for SE London and should know the impact. If she doesn’t know about her own patch what hope anywhere else? And what of Matthew Pennycook who at this rate will lose his seat if the recent council elections are a guide as the greens took much of Greenwich and came very close in Woolwich. If he wants new homes maybe ask why his own government cuts rail through new housing sites? Just a tip. Bunch of amateurs. I just find the politics fascinating. Cut rail = drive people to Greens. Cut rail after nationalisation = make public control seems bad and enhance the privatisation push of Reform.
Yesterday, on a rare visit to London, meeting up with a family member in the UK for a wedding, we travelled to Greenwich on a UBER boat, lovely in the open deck at the rear, from Embankment. After a picnic, and a look around the market decided to return to the city via DLR, not realising it was shut. Found the Lewisham bus replacement stop, but took a while to discover the Canada Water stop, surely TFL could have put a map on the closed station window, as non locals wouldn’t be aware. We got back via the Jubilee Line OK. Only then did we discover the line closure notice. There were a lot of tourists, the boats were all full.
Wait so they want to cut services at the same time there are are no services to Charing Cross for a few weeks this summer? I know trains on the Greenwich line don’t go there but there will be a cumulative impact at London Bridge of no trains to Waterloo East and Charing Cross PLUS Thameslink cuts towards Blackfriars and beyond.
Would Thameslink operate to Caterham, Tattenham Corner and Epsom Downs from Luton and/or St. Albans City using Class 700/0 8-Car trains. And Southern to continue on the London Victoria/London Bridge-Caterham, Tattenham Corner and Epsom Downs metro services.
Alarming to hear this as I rely on trains from Swanscombe to Abbey Wood and then change to the Elizabeth line for work. What they don’t realise is that new apartments were built which are car free and sold as having good rail links. Then they are cut. Really poor form and this will impact a lot of people. We still need to go to work in the summer. Thameslink is poor at the best of times yet when down to one per hour and one is inevitably cancelled we have a two hour wait? I can’t afford that as have to do nursery pick ups. Joint up thinking is out the window from government in regards to housing, transport and everyday costs like childcare at the best of times. This is awful.
The list of cancellations shows that the half-hourly frequency on the Abbey Wood section is largely maintained at work times.
First we had reductions in bus services, and now we are losing some of our trains. What have we done to deserve this?
Also to bear in mind that a whole new village/estate consisting of hundreds (or thousands) of new homes are being built at Plumstead which will naturally start to impact and overcrowd already busy services.
This line is frankly a nonsense and consistently treated poorly when compared to Sidcup & Bexleyheath
Perhaps it’s time to say goodbye to Govia Thameslink Railway (GTR) and say hello to DfT operated Thameslink Southern & Great Northern (TSGN). That will become part of Great British Railways next year. And with the Thameslink Class 700 Desiro City trains that will be turning 10 years old on June 20th. Since it entered service 10 years.
I think it wouldn’t change much with Thameslink once it’s been nationalised and taken over by DfT (Great British Railways) and it’s possible that some of Thameslink services could be lost.
And Southeastern to reinstate some of its outer-suburban services especially Sevenoaks and Orpington. Since Southeastern inherited the Class 707 City Beam trains from South Western Railway which is being used on the metro and outer-suburban routes.
Would it not affect the transition of Thameslink that is to be re-nationalised and to be taken over by DfT (Great British Railways) on Sunday and to say goodbye to Govia Thameslink Railway “GTR”.
Since GTR took over from First Capital Connect way back in 2015 and Southern along with Gatwick Express to merge with Thameslink and Great Northern operators as 1 big train company called Thameslink Southern Great Northern “TSGN” in 2016.