Blackwall tunnel full southbound weekend closure for Greenwich bridge demolition
The Blackwall tunnel will close all weekend from 24th to the 26th June for southbound traffic to demolish a footbridge.
Northbound traffic will still be able to drive through the tunnel though a diversion will be in place. Similar measures caused long delays when a new bridge was installed.

Bus route 108 will not cross the Thames for the duration of weekend works.
A further weekend closure from 8th to 10th July is expected for further work though is not confirmed yet by Transport for London.

A new bridge was installed in recent months to allow more traffic lanes below as part of Silvertown Tunnel work.