Thamesmead to Woolwich street changes dropped as project revised

Plans for street changes as part of a £23 million project between North Thamesmead and Woolwich have been revised following a previous consultation.

Proposals for an eastbound lane on Plumstead Road have been dropped, while a bus-only road at Barnham Drive has been paused.

Greenwich Council state they will pull out of the project, which is in partnership with Homes England and TfL, if a lane on Plumstead Road progresses.

As for the Barnham Drive proposal, a Greenwich report notes “there are a number of issues that TfL needs to consider in implementing this link at the present time, meaning TfL has taken the decision to pause the project.”

DLR would only serve north of Thamesmead and not link to Elizabeth line or other parts of town

Long gestation

This Thamesmead to Woolwich project has been around for many years and remains a rather odd proposal, including the Barnham Road scheme.

Not that the Barnham Road element provides no benefit at all, as it would, but it would do little for a future Bus Rapid Transit (BRT) scheme as any bus using it would not be taking the quickest route from north Thamesmead to Woolwich therefore why was it included within a ‘rapid transit’ project?

Ah, but what’s this? They’ve now dropped the ‘rapid’ part from the project name when it was delayed from a 2026 completion to 2029. How convenient. Perhaps the people of Thamesmead don’t need fast links.

Heading towards Thamesmead North from Thamesmead Central

What this means is they drew up a project that would would benefit slower buses that meander around Thamesmead estates but not support the core aim of BRT funding that should be ensuring fast links from new homes in North Thamesmead towards plentiful travel options in Woolwich town centre.

Because no one in forthcoming houses wants quick access to the wildly popular Elizabeth line presumably.

Minimal changes proposed

What we’re left with at this moment in time are some slightly reworked kerbs along a dual carriageway and new crossings. It’s all very nice but incredibly lacking in any sort of ambition.

There’s not even any sign of improving other areas for bus users including a pinch point just before buses from Thamesmead reach stops at Abbey Wood station.

Pinch point. Bus lane disappears here in Abbey Wood as road narrows to one lane in each direction.

Until this spot buses generally run quickly given a dedicated lane along Harrow Manorway.

This would be a no-brainer project to benefit all bus routes heading from Thamesmead to the Elizabeth line. No sign of it.

Funding difference

Essentially the entire project covered in this week’s council reports – and much else in the area when it comes to transport links to stations – is severely lacking.

All any sort of effort, funding or focus goes towards is DLR this, DLR that from TfL and Greenwich Council while all but ignoring many other major growth areas and links to nearby railway and tube stations.

So are there any meaningful improvements anytime soon elsewhere? There’s little sign.

It’s all quite evident in funding. The Thamesmead rapid transit project (sorry, now just a transit project) has been allocated penny change in comparison of the far more expensive DLR proposal to North Thamesmead (£23 million to link new homes to the Liz line v £1.5bn for the DLR) despite the Elizabeth line, Southeastern and Thameslink in Woolwich and Abbey Wood offering far higher frequencies, faster journeys and many more destinations for anyone moving to new Thamesmead homes, compared with an extension of the DLR Beckton branch under the river.

Then again, TfL have recently cut buses serving many new developments via the 472 bus cut including new homes in south Thamesmead when the SL11 replaced it, so one wonders just what is going on over there.

New homes in south Thamesmead. More than 800 have seen reduction in bus services recently

TfL never took the opportunity to rework the 472 route to call at almost 2,000 new homes underway in west Thamesmead/Plumstead or even install a bus stop outside for the SL11.

It appears a fixation on an expensive and lacking DLR plan that barely serves any of Thamesmead is taking precedence over providing funds and services for many new homes underway right now – let alone what future residents will want to use.

That ensures bus cuts in the near term with little spend in the mid to long term for all of Thamesmead when it comes to linking to the Elizabeth line and other rail services.

The utter paucity of these plans highlight it all too clearly.

History

As noted before on this site Transport for London once had the right general idea 20 years ago for Thamesmead and areas beyond, which was the Greenwich Waterfront Transit connecting much of Thamesmead to nearby stations using high capacity, high frequency vehicles.

Trams became trolley-buses before it was watered down to a bus.

Boris Johnson scrapped it but Sadiq Khan has never attempted to bring it back. Doing so would not only aid most of Thamesmead – in contrast to the DLR plan – but also serve thousands of new homes in Woolwich, a proposed 8,000 at Charlton Riverside and 20,000 across Greenwich peninsula.

Plans for 8,000 homes in Charlton but no confirmed high transit scheme

Greenwich Council and TfL have just announced a new partnership for 8,000 new homes in Charlton but there’s no news on what public transport will serve it.

No substantial transport link seems on the cards to any great degree at various towns while the expensive and limited North Thamesmead DLR plan will see vast sums, in turn ensuring large areas of south east London could miss out on transformative transport changes.

Little ambition

The latest seen this week in Greenwich’s latest reports covering minuscule work proposed between North Thamesmead and Woolwich again only appears to underline it further.

Development plans across the peninsula but no mass transit across the site connecting to the Jubilee line

If the goal is housebuilding increases from Thamesmead (and in all the town) to Greenwich, TfL’s plans are far from ideal.

There needs to be far more ambition in how to connect up to 15k new homes in north Thamesmead to the Elizabeth line as well as how to serve 8,000 new homes in Charlton and more than 20,000 in Greenwich peninsula. Extending the odd bus route doesn’t cut it and nor do slight changes to roundabout approaches or kerbs in Thamesmead. That’s tick box stuff that’s changing little on the ground.

TfL once had that ambition. We see little of it now.

Join the mailing list here to receive updates in your mailbox.

Support this website via Paypal here

There's also the Ko-fi option to buy me a coffee

Many thanks

You can also support the site by adding the Murky Depths as a trusted source in Google here

There's also a Facebook page for the site here

3 thoughts on “Thamesmead to Woolwich street changes dropped as project revised”

  • There’s also bus lanes mentioned on the A-roads in Thamesmead such as Western Way but why? Buses are almost never delayed there as road capacity is vastly in excess of demand. It’ll help when new homes are built but that will surely not be the sum total of improvements for passengers heading to Elizabeth line rail services from the “new town” in Thamesmead? TFL’s obsession with the DLR going there to the detriment of other improvements across a swath of the town and wider borough while also pushing through regular bus cuts is misplaced and frankly bizarre.

    Reply
  • New eastbound lane on the gyratory seems to be dropped as it “may promote private car usage and may also have implications in terms of carbon neutrality.”

    I hope this doesn’t mean any of the work they have just finished on the eastern side has to be redone…

    Reply
    • As a long time resident of Thamesmead I think that the DLR is a total waste of time and money and we don’t need it.
      Bring back the 472 and get rid of the silly roundabout by Sainsbury’s at Abbey Wood as it holds up traffic even the buses.
      I bet anyone from TFL has even been to Thamesmead
      I apposed the DLR and City Airport but the airport went ahead and I expect the DLR will too
      Alan s

      Reply

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.