Superloop bus route from Greenwich to Abbey Wood Elizabeth line consultation commences
Transport for London have launched a consultation on new Superloop route SL11 between North Greenwich and Abbey Wood.
The route will offer north Thamesmead a second Superloop route offering quick access to the Elizabeth line despite Peabody failing to build a single home in the area – nor even draw up any detailed plans.

In 2023 central government made £23 million available for a Bus Rapid Transit (BRT scheme) which has morphed into this Superloop proposal.
The route will replace the existing high frequency 472 bus much as the Greenwich Waterfront Transit once would have done before that plan was scrapped in 2009 by Boris Johnson.

However the 472 wouldn’t entirely die as on overnight service will continue in the shape of the N472. The SL11 would not see 24 hour services.
Changing daytime services from an all-stopping 472 to a limited stop SL11 won’t speed up journeys substantially from north Thamesmead to Woolwich given it’s already quick with wide dual carriageways throughout, bus lanes and few stops.

Rather oddly the proposed SL11 route will not stop at almost 2,000 homes now rising at Lombard Square near Plumstead bus garage.
Whilst of course it’s an express route so limited stops are to be expected, it is due to stop at more sparsely populated areas such as Western Way while sailing past 2,000 new homes.

The consultation offers little insight into what the £23 million awarded for a BRT would be spent on. There’s no mention of improving the pretty dismal one-way system around Plumstead garage beside 2,000 new homes which seemed the most likely candidate for physical public realm and street improvements along the route.
No other Superloop routes saw central government funds for Rapid Transit projects. It does vaguely say “subject to funding, these plans would be shared for public consultation at a later date” but given funding was announced at the Autumn Statement back in 2023 one would expect some information.

Also the “subject to funding” isn’t great to see. Greenwich council could assist with substantial unallocated and unspent Section 106 income ringfenced for transport and public realm.
A Greenwich Council report last month stated they have £2.2 million in S106 revenue obtained but unspent for public realm improvements alongside £8.7m for transport.
Woolwich
Changes in Woolwich include dropping some stops in the town centre as the SL11 heads both ways along Beresford Street.

In Woolwich eastbound towards Abbey Wood the SL11 would serve Woolwich Elizabeth line station but not:
- Bus stop Y for John Wilson Street/Powis Street
- Bus stop T for Thomas Street/Green Ends
- Bus stop N for Woolwich Arsenal Station

Heading westbound towards North Greenwich the SL11 would call at Woolwich Station (near the old covered market) but not:
- Bus stop U for Beresford Square/Woolwich Arsenal station
- Bus stop A for Woolwich Ferry

Bus stands on Woolwich High Street will still block buses heading west.
Skipping new developments
There’s also no stop planned beside the rebuilt Morris Walk estate near Charlton. Areas north of the railway line are nearly complete and have seen a doubling of homes.
Again, expecting a stop everywhere is unrealistic but high density new developments en route would seem a sensible place to call.

At least in this area other bus routes do stop directly outside unlike Lombard Square near Plumstead bus garage and the one-way system.
From then on it’s through Charlton, Bugsby’s Way then Greenwich peninsula via the existing 472 route.

Relying on Peabody
The main reason the SL11 was drawn up in the first place is to facilitate new housing in north Thamesmead, yet whether it’ll spur Peabody to speed up housebuilding remains in doubt. The first Superloop to serve it which commenced last year hasn’t so far resulted in any public sign of Peabody getting moving.
In addition Peabody havn’t built upon – nor intend to in forthcoming years – many plots in south Thamesmead seconds from the Elizabeth line in Abbey Wood. A stop that also sees Thameslink and Southeastern Metro services to various parts of the capital and beyond.
Just last month one proposed Peabody development near Abbey Wood station saw planning permission lapse after five years of inactivity. Bexley Council wrote to the organisation in advance of the application lapsing but failed to receive a response.

Another site around a minute’s walk from Abbey Wood station where residents and shop owners were evicted now sees no plan to build until the late 2030s.
Across the road at what was known as Cross Quarter Phase two before Peabody took over has no plans to build whatsoever. A sizeable wasteland sits untouched for a decade and counting.

If an £18 billion new railway which is Europe’s largest infrastructure project radically improving links doesn’t hurry them up, will a £23m bus route? After all north Thamesmead is already a short bus ride to the Elizabeth line via existing Superloop route SL3.
More than 5,000 homes can be built in north Thamesmead before further investment in transport is required – but Peabody are failing to even do that. No masterplans or SPDs are in evidence or in consultation let alone outline or detailed planning applications. Spades in the ground? Forget it.

DLR
All while this is happening Peabody are still pushing for a DLR extension to north Thamesmead while they’re utterly failing to embrace what the Elizabeth line and express buses already now offer.
TfL are also still stating this proposed route is a pre-cursor to a DLR extension.

It seems a bit rich for Peabody to lobby for the DLR given their track record and particularly if doing so hampers improved transport for a now-doubled plan for 20k+ homes north of the river at Barking Riverside.
And as long known the DLR extension wouldn’t even reach Abbey Wood station and its plentiful transport links where most in Thamesmead using trains actually want to go.
For the vast majority of Thamesmead’s residents – both existing and forthcoming – it’d still be quicker post-DLR to reach much of the capital by taking a Superloop (or a tram to facilitate 15k+ new homes) for five minutes to Abbey Wood then onto the Liz line to reach Canary Wharf in 10 mins, Stratford in 20, the City of London and west end around 15-20 minutes then onto west London or changing at one of many interchanges along the way.
Then there the many destinations Southeastern and Thameslink offer such as Greenwich, Lewisham, London Bridge, Farringdon, St Pancras etc etc.
The idea another Superloop route serving north Thamesmead will achieve much in terms of facilitating much needed new housing remains a severe doubt as long as Peabody are taking the lead – excellent transport links or not.
Still, in an ideal world this new Superloop does commence soon to assist new developments now rising en route in other areas while Peabody’s control of north and south Thamesmead is relinquished and moved to organisations and developers actually willing to build at pace. Housing starts then increase across north Thamesmead while the DLR stays north of the Thames to assist 20k+ new homes in Barking.

South of the river once those first few thousand homes are built in north Thamesmead a tram network gets underway to facilitate the next ten thousand homes in north Thamesmead alongside lines to other major growth areas with thousands of proposed homes such as Belvedere and Erith, which is something else the DLR will not do.
Basically all what TfL proposed until 2009 when Boris Johnson scrapped the lot and the current half-baked replacements were dreamt up.
But enough of complaints, I’m off to fill out the consultation. You should too.
Join the mailing list here to receive updates in your mailbox.
Support this website via Paypal here There's also the Ko-fi option to buy me a coffee Many thanks You can also support the site by adding the Murky Depths as a trusted source in Google here There's also a Facebook page for the site here
Peabody wanting the DLR will never not be funny after they’ve been given Europe’s most expensive infrastructure project near much of Thamesmead and they still wont build! I can’t see another superloop doing anything. Imagine if a DLR across to Thamesmead is built and then opens to a vast empty field. If the Elizabeth line is a guide they’ll also then do little for 20 years upon completion. If Peabody are left to their own devices that’s what will happen.
Interesting that the Woolwich map still includes the Greenwich Heritage Centre, despite this closing many years ago.
Perhaps TfL are living a decade in the past. There were two things I expected to see day one from the consultation:
1) Changes to the one-way system from £23m grant funding
2) A new stop on the one-way system to serve 1,900+ homes at Lombard Square and 333 at the nearby care home site
Do TfL even know about these? Are Greenwich telling them?
Ultimately its revealing the whole thing is supposed to be for north Thamesmead but Peabody are *so* poor at doing their main job of building new homes there’s none there nor any planned in coming years – so the SL11 could at least benefit other big developments en route.
Certainly an odd proposal for north Thamesmead and surrounding areas as things stand without any housing going up there. For existing residents hoping to reach the Elizabeth line from most of Thamesmead surely taking the existing SL3 would be preferable as
1. It’s very quick to reach Abbey Wood station
2. Both Abbey Wood and Woolwich are the same fare zone 4 so no saving by heading to Woolwich
3. Abbey Wood is the first stop so more chance of a seat
4. Woolwich station is often congested with fewer entrances
5. Abbey Wood to Woolwich on the EL only takes three mins so barely a hindrance going to Abbey Wood to start the journey
All that in mind who would use the SL11 in Thamesmead until new homes are finally built?
The latest TfL board paper mentioned that the bus transit will be separate to this and has also been delayed to 2029 with a consultation in December, so perhaps this is something of a stop-gap. Hesitant to say it is promising it has been delayed, but that does indicate to me that the works they’re proposing are more substantial.
Thanks will have to look that up. I had a read of the Board report but must have missed that. In the 2024 TfL Bus Plan they stated a 2026 deadline to spend. https://www.fromthemurkydepths.co.uk/2024/02/29/woolwich-to-thamesmead-23m-bus-rapid-transit-funds-must-be-spent-by-2026/
If the deadline has moved from 2026 to 2029 that makes the imminent start of SL11 a bit more odd. Doesn’t serve any new homes in north Thamesmead, skips new developments elsewhere, no infrastructure improvements imminent to speed it up. Much point in it starting soon?
The proposed Superloop route SL11 is the just the 472 re-branded in to the superloop livery costing thousands of pounds of public money. The SL11 will serve fewer stops than the current 472.
Would be far better and more cost effective to increase the frequency on the existing route 472 between Abbey Wood and North Greenwich via Thamesmead Woolwich and Charlton instead of introducing the SL11.
I totally agree witb Graham 100%.
TFL should enhance the existing 472 bus route with additional buses introduced on tbe route to increase the frequency.
This would better serve local residents served by route 472 many of whom use the buses for local journeys.
Just increase the frequency on the existing 472 bus route between Abbey Wood and North Greenwich. Then spend the money Improving other local bus routes in the area. Or introduce a new bus route between Thamesmead and Lewisham via Abbey Wood, Plumstead, Woolwich, Lower Charlton, East Greenwich. Greenwich Town Centre and Lewisham Station. Replacing the bus link lost when route 180 was re-routed to North Greenwich Station.