Greenwich to Woolwich cycle scheme consultation underway

Transport for London have launched a consultation seeking feedback on changes to streets running between Greenwich and Woolwich.

A segregated cycle lane was installed in 2021 along most of Trafalgar Road and Woolwich Road leading to Charlton where it stops and a bus lane was installed.

Map covering east Greenwich project area

In summer 2022 alterations were made, which this consultation covers. They included bus stops being reintroduced. A full list can be seen here.

A number of new housing developments lay along the route, including at the former Speedy Hire site.

Speedy Hire site will become mixed use site with housing above shops

Before the pandemic Cycle Highway 4 was due to extend from Tower Bridge to Woolwich ferry. Extensive plans were drawn up which now seem on hold.

The consultation will run for six months, and can be viewed here.

 

 

------------------

Adverts are far from enough to cover site costs and my rent.

You can support me via Paypal here

Another option is via Patreon by clicking here

You can also buy me a beer/coffee at Ko-fi here

There's also a Facebook page for the site here

Many thanks

J Smith

I've lived in south east London most of my life growing up in Greenwich borough and working in the area for many years. The site has contributors on occasion and we cover many different topics. Living and working in the area offers an insight into what is happening locally.

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.