Design alterations proposed for half-built Greenwich hotel

recently announced they are looking to open a long-stalled half-built hotel in 2020 beside the Blackwall Tunnel approach in Greenwich.

Former plans for an Ibis franchise collapsed with the concrete frame standing forlornly for a few years now. With Holiday Inn taking over comes revised plans.

Half built

They are looking to alter the approved facade and adopt a darker colour pallet for the main bulk of the building.

Previous plans saw “two additional part-storeys and extension of fourth and fifth floors to create a Part 4, Part 6 and Part 8-storey Hotel providing 68 Bedrooms” -which was an increase from 50 originally approved.

Click here to see plans.

Independent sites can only continue with the support of readers.

You can support me via Paypal here

There's the Ko-fi option to buy me a coffee

Many thanks

You can also support the site by adding the Murky Depths as a trusted source in Google here

There's also a Facebook page for the site here

One thought on “Design alterations proposed for half-built Greenwich hotel”

  • What happened to it becoming a radisson red hotel?

    Reply

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.